Skip to main content
You are
Professionals
  • DIY
Corporate website
Onduline UK
Lightweight roofing systems
You are
Professionals
  • DIY
Main Professionnels (EN)
Why Onduline?
Why Onduline?
About Onduline
History of Onduline
News
Sustainability
Products
Products
By solution
Roofing
Roofing Underlays
Plastics: Rooflights
Waterproofing & Protection
By application
Residential
Timber Frame Buildings
Equestrian
Agricultural
Industrial
Leisure housing
Public Buildings
Storage building
By range
ONDULAIR
ONDULINE
ONDUVILLA
ONDUCLAIR
BARDOLINE
FONDALINE
ISOLINE
ONDUTISS
All products
All accessories
Your tools
Simulator
Request a sample
Projects Gallery
Projects Gallery
Trends & Ideas
Gallery
Videos
Testimonials
Case Studies
Stable Block, DURO SX 35
Renovation of Heritage site: ISOLINE
Historical Renovation: ISOLINE
Cultural Centre Brazil: Gold LEED
The Chickenshed: ONDULINE CLASSIC
Your tools
Simulator
Follow us on social networks to find ideas and inspiration
Facebook Twitter Youtube LinkedIn Pinterest Instagram
Tools & Resources
Tools & Resources
Good to know
Why Onduline?
Projects checklists
Regulations
Sustainability
Certifications
Roofing Expert Advice
Condensation & Ventilation
Snow & Wind Loads
Replacing a Roof
Safe roofing practices
Installation & Technical Data
Installation
Product Overview Brochure
Guarantees
Documents
DOP
Technical data sheets
FAQ
Your tools
Request a sample
Roof Advisor
Corporate website
  • Contact
  • Storelocator
  • User
Breadcrumb
  1. Home
  2. Media center
  3. Installation
  4. ONDUVILLA Installation

ONDUVILLA Installation

1. Start installation at eave, in the opposite direction of the prevailing wind. Position the dark strip on top. Stagger the rows, by starting the second row with a half tile. Horizontal overlaps are one corrugation. 
Ensure proper waterproofing by aligning the overlapping guides.

Overhang at eave must be maximum 5 cm. 


Installation principal for Onduvilla tiles

 

2. Stagger the rows, by starting the second row with a half tile. Ensure proper waterproofing by aligning the overlapping guides.

Installation Onduvilla Step 1


 

3. The aesthetics and wind uplift protection can be optimized by using the verge element accessory, which is fixed first on the sidewall, then as well on the top of the corrugation.

Installatio of Verge with Onduvilla tiles

4a. Ensure watertightness at ridge by applying the ONDUVILLA FOAM FILLERS, on both sides of the ridge line.

 

4b. Cover the ridge with the SLIM CAP and fix it on each side of the roof, through the FOAM FILLERS, on top of the corrugations. The direction of the overlap is opposite to the direction of the prevailing winds.

Installation of Slim caps on a roof covered with Onduvilla tiles

5. Finish the ridge with the CLOSURE CAP element for better aesthetic and better waterproofing.

 

You can donwload the brochure below to know more about ONDUVILLA roofing tiles installation or have a look at our installation video clicking here.  

ONDUVILLA TILE STRIP INSTALLATION pdf - 3 MB
FOLLOW US
  • Facebook
  • Twitter
  • Youtube
  • LinkedIn
  • Pinterest
  • Instagram
  • Contact
  • News
  • Sitemap
  • FAQ
  • Customise Cookies
  • Privacy Policy
  • Anti-corruption policy
  • A Ondura Group company
SEARCH
FAQ
Contact Us
Choose a country
  • Africa
  • Austria
  • Belgium
  • Belize
  • Brazil
  • Bulgaria
  • Chile
  • China
  • Colombia
  • Costa Rica
  • Croatia
  • Czech Republic
  • France
  • Germany
  • Great Britain
  • Guatemala
  • Honduras
  • Hungary
  • Indonesia
  • India
  • Italia
  • Japan
  • Kyrgyzstan
  • Malaysia
  • Mexico
  • Myanmar
  • Nicaragua
  • Peru
  • Philippines
  • Poland
  • Portugal
  • Romania
  • Salvador
  • Serbia
  • Slovenia
  • Spain
  • Tajikistan
  • Thailand
  • Turkey
  • Ukraine
  • USA
  • Uzbekistan
  • Vietnam

__MODAL_TITLE