Skip to main content
You are
Professionals
  • DIY
Corporate website
Onduline UK
Lightweight roofing systems
You are
Professionals
  • DIY
Main Professionnels (EN)
Why Onduline?
Why Onduline?
About Onduline
History of Onduline
News
Sustainability
Products
Products
By solution
Roofing
Roofing Underlays
Plastics: Rooflights
Waterproofing & Protection
By application
Residential
Timber Frame Buildings
Equestrian
Agricultural
Industrial
Leisure housing
Public Buildings
Storage building
By range
ONDULAIR
ONDULINE
ONDUVILLA
ONDUCLAIR
BARDOLINE
FONDALINE
ISOLINE
ONDUTISS
All products
All accessories
Your tools
Simulator
Request a sample
Projects Gallery
Projects Gallery
Trends & Ideas
Gallery
Videos
Testimonials
Case Studies
Stable Block, DURO SX 35
Renovation of Heritage site: ISOLINE
Historical Renovation: ISOLINE
Cultural Centre Brazil: Gold LEED
The Chickenshed: ONDULINE CLASSIC
Your tools
Simulator
Follow us on social networks to find ideas and inspiration
Facebook Twitter Youtube LinkedIn Pinterest Instagram
Tools & Resources
Tools & Resources
Good to know
Why Onduline?
Projects checklists
Regulations
Sustainability
Certifications
Roofing Expert Advice
Condensation & Ventilation
Snow & Wind Loads
Replacing a Roof
Safe roofing practices
Installation & Technical Data
Installation
Product Overview Brochure
Guarantees
Documents
DOP
Technical data sheets
FAQ
Your tools
Request a sample
Roof Advisor
Corporate website
  • Contact
  • Storelocator
  • User
Breadcrumb
  1. Home
  2. Media center
  3. Installation
  4. ONDULINE EASYFIX Installation

ONDULINE EASYFIX Installation

1.

Start laying sheets over the gutter with 7 cm overhang maximum. Installation could be realized either on full deck (recommended) or on discontinuous support (37 cm between purlins).

Onduline

 

2.

15 fixings minimum should be used per sheet. The fixing, always set in the top of corrugations, should be done in the right order and in between the two overlapping lines. Wait to fix the last corrugation until you overlap it with the next sheet.

 

Onduline installation

 

3.

Cover the ridge with the standard ridge and fix it on each side of the roof, on topof each corrugation. The direction of the overlap is opposite to the direction of the prevailing winds.

 

onduline

 

4.

Lay sheets in the opposite direction to 6 the prevailing winds. Stagger the rows, by starting the second row with a half sheet. Ensure easily the waterproofing by aligning the two overlapping lines.

onduline

5.

The aesthetics and wind uplift protection can be optimized by using the verge element accessory, which is fixed first on the sidewall, then as well on the top of the corrugation.

onduline

 

6.

ONDULINE sheets provide an attractive, colored and long lasting finishing to a wide variety of buildings.

onduline

Onduline Easyfix DIY leaflet 2018_0.pdf pdf - 686 kB
Find an Onduline stockist

We have stockists nationwide from DIY stores, building supplies and timber merchants to numerous online partners that have a range of Onduline lightweight roofing products available to order online with delivery straight to your door.

Find a point of sale
FOLLOW US
  • Facebook
  • Twitter
  • Youtube
  • LinkedIn
  • Pinterest
  • Instagram
  • Contact
  • News
  • Sitemap
  • FAQ
  • Customise Cookies
  • Privacy Policy
  • Anti-corruption policy
  • A Ondura Group company
SEARCH
FAQ
Contact Us
Choose a country
  • Africa
  • Austria
  • Belgium
  • Belize
  • Brazil
  • Bulgaria
  • Chile
  • China
  • Colombia
  • Costa Rica
  • Croatia
  • Czech Republic
  • France
  • Germany
  • Great Britain
  • Guatemala
  • Honduras
  • Hungary
  • Indonesia
  • India
  • Italia
  • Japan
  • Kyrgyzstan
  • Malaysia
  • Mexico
  • Myanmar
  • Nicaragua
  • Peru
  • Philippines
  • Poland
  • Portugal
  • Romania
  • Salvador
  • Serbia
  • Slovenia
  • Spain
  • Tajikistan
  • Thailand
  • Turkey
  • Ukraine
  • USA
  • Uzbekistan
  • Vietnam

__MODAL_TITLE